Supply
Vent and draw-o
pipe to hot water
Hot water cylinder
Connect
‘A’ or ‘B’
Cold feed
to cylinder
B
A
NB: THE BASE OF THE QUARTZ
TM
SMART VALVE MUST BE SITED NO
HIGHER THAN THE BASE LEVEL
OF THE CISTERN
10m
max
smart
shower
control
Supply
Pressure
reducing valve
if required
10m
max
smart
shower
control
Supply
Hot water
cylinder
10m
max
smart
shower
control
10m
max
smart
shower
control
Central
heating
boiler
Supply
Supply
Vent and draw-o
pipe to hot water
Underside of cistern
Hot water
cylinder
NB: 1.5 bar MINIMUM pump rating
Cold feed
to cylinder
Connect
‘A’ or ‘B’
B
A
10m
max
smart
shower
control
Typical gravity system installation
(compatible with pumped Quartz smart valve)
Typical combination boiler installation
(compatible with standard Quartz
TM
smart valve)
Typical UHW system installation
(compatible with standard Quartz
TM
smart valve)
Typical thermal storage unit system installation
(compatible with standard Quartz
TM
smart valve)
Typical pumped system installation
(compatible with standard Quartz
TM
smart valve)
TM
IMPORTANT INFORMATION
Safety information
This product must be installed by a competent person in accordance with all relevant current Water Supply Regulations.
ALL PRODUCTS REQUIRING AN ELECTRICAL CONNECTI0N MUST BE INSTALLED BY A QUALIFIED PERSON FOLLOWING THE LATEST REVISION OF BS 7671
(WIRING REGULATIONS) AND CERTIFIED TO CURRENT BUILDING REGULATIONS.
This system should be installed so that other taps or appliances operated elsewhere within the premises do not significantly aect the flow.
The Quartz
TM
smart valve must not be used with a hot water supply temperature of over 65ºC.
The Quartz
TM
smart valve is supplied factory pre-set at maximum temperature of 45ºC. The maximum temperature is fully adjustable to suit site conditions. If adjusted, we
recommend the outlet temperature is set to a MAXIMUM of 46ºC.
The Quartz
TM
smart valve must be installed in an accessible location for servicing and maintenance.
The Quartz
TM
smart valve must not be installed in situations where either the ambient temperature is likely to exceed 40ºC or where freezing may occur.
The Q
TM
controller must not be installed in situations where the ambient temperature is likely to fall below 5ºC or rise above 40ºC.
We do not recommend the use of smart controls in steam therapy facilities.
This appliance must be earthed.
Cables which are chased into the wall must be protected by a suitably sized conduit or sheathing to allow for removal in the event of service and maintenance purposes.
Ensure that the conduit is run to avoid the controller fixing holes.
Surface mounted cables must also be protected by a suitable approved conduit, even in a loft, where there may be a risk of damage from vermin.
The power lead must only be replaced by the manufacturer or his accredited agent.
The Q
TM
controller is supplied from a safety low voltage source.
This product is suitable for domestic use only.
Aqualisa smart products are supplied complete with a 1 year guarantee that can be upgraded to 5 years by registering the product with Aqualisa.
This product is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities or lack of experience and knowledge, unless they have
been given initial supervision or instruction concerning the use of the product by a person responsible for their safety.
Children should be supervised to ensure they do not play with the product.
Installation of Quartz
TM
smart valve (for gravity stored systems)
The Quartz
TM
smart valve is designed to operate up to maximum static pressure of 100kPa ((1 bar)(10 metres head)(14.5psi)). Under no circumstances must the Quartz
TM
smart
valve be connected directly to the water main or in line with another booster pump. The minimum actual capacity of the cold water storage cistern should be not less than 225
litres (50 gallons). The capacity of the hot water cylinder must be capable of meeting anticipated demand.
Installation of the Quartz
TM
smart valve (for balanced high pressure and unvented systems, combination boiler systems and separately pumped gravity
systems)
Pressures: The Quartz
TM
smart valve is designed to operate up to a maximum static pressure of 700kPa ((7 bar)(100psi)). Where pressures are likely to exceed 700kPa ((7 bar)
(100psi)), a pressure reducing valve must be fitted to the incoming mains supply. A setting of 400kPa ((4 bar)(60psi)) is recommended. It should be noted that daytime pressures
approaching 600kPa ((6 bar)(80psi)) can rise above the stated maximum overnight.
Special notes for combination boiler systems
The appliance must have a minimum domestic hot water rating of 24kW (80,000BTU) and be of the type fitted with a fully modulating gas valve.
If in any doubt, please contact the appliance manufacturer before installation commences.
PLEASE NOTE: DUE TO PERFORMANCE CHARACTERISTICS OF COMBINATION BOILERS, SEASONAL INLET TEMPERATURE CHANGE WILL AFFECT THE QUARTZ
TM
SMART
VALVE OUTLET FLOW RATE RESULTING IN VARYING SHOWER FLOW RATE AND FLOW CONTROL RANGE. INLET TEMPERATURE CHANGE MAY ALSO CAUSE THE
TEMPERATURE DISPLAY TO FLASH; THIS IS NOT NECESSARILY CHANGING THE OUTLET TEMPERATURE.
Special notes for separately pumped gravity systems, Universal pumps/divert
We recommend a twin ended pump with a MINIMUM pump rating of 1.5 bar (recommended 2.5 bar) which should be used for all separately pumped installations.
A twin ended pump is required for use with single outlet smart products, with the exception of divert models.
PLEASE NOTE: A Universal type twin ended pump (works on both positive and negitive head conditions) is required for use with divert products.
The minimum actual capacity of the cold water storage cistern should be not less than 225 litres (50 gallons). The capacity of the hot water cylinder must be capable of
meeting the anticipated demand.
THIS PRODUCT IS NOT SUITABLE FOR USE WITH A SINGLE ENDED PUMP.
Connections
This product incorporates ‘push-fit’ type connections. Tube should be cut using a rotary type cutter and lubricated using a silicone-based lubricant or petroleum jelly (Vaseline or
similar) prior to insertion into the fitting.
If plastic pipe is used, the tube insert must not increase the tube diameter or extend the cut-o length by more than 2mm.
THESE FITTINGS ARE NOT SUITABLE FOR STAINLESS STEEL TUBE. COMPRESSION FITTINGS MUST NOT BE USED.
Pipe sizing
Long pipe runs, on both inlet and outlet, will reduce the flow rate at the outlet, for gravity or gravity pumped systems 22mm pipe work should be used on inlets and reduce down
to 15mm as close to the Q
TM
smart valve as possible to reduce pressure losses and help maintain flow rate. If using 15mm pipe, copper pipe is preferred, to optimise performance
minimise the number of elbows used. If long pipe runs are unavoidable on the outlet, use copper pipe rather than plastic, particularly if a diverter is used, and minimise the number
of elbows as the pipe inserts are very restrictive.
Flushing
Some modern fluxes can be very corrosive and, if left in contact, will attack the working parts of this unit. All soldering must be completed and the pipe work thoroughly flushed
out in accordance with current Water Supply Regulations prior to connection of the product.
Declaration of Conformity
Aqualisa Products Limited declares that the Quartz
TM
smart valve, in conjunction with the diverter and smart controllers, complies with the essential requirements and other
relevant provisions of the Low Voltage Directive (2014/35/EU) and the EMC Directive (2014/30/EU) and the RE Directive (2014/53/EU.
After installation
Familiarise the end user with the smart operation and hand them this guide. Complete and post the guarantee card or register online at www.aqualisa.co.uk
!
!
QUARTZ
TM
SMART VALVE
AND DIVERTER
INSTALLATION GUIDE
Aqualisa Products Limited
The Flyers Way
Westerham Kent TN16 1DE
Customer Services: 01959 560010
Warranty registration: 0800 408 4243
Brochure hotline: 0800 652 3669
Website: www.aqualisa.co.uk
Live Chat at aqualisa.co.uk
Republic of Ireland
Sales enquiries: 01-864-3363
Service enquiries: 01-844-3212
Follow us on:
Please note that calls may be recorded for training
and quality purposes.
The company reserves the right to alter, change or
modify the product specifications without prior warning.
® Registered Trademark Aqualisa Products Limited.
Did you know we oer free
installer training?
• Locations across the UK
• Expert installation advice
• Deals on the day
Book your place!
aqualisa.co.uk/training
01959 560042
Part No.703213 Issue 01 Jan 17
QUARTZ
TM
SMART VALVE AND DIVERTER
1
To ensure safe operation and installation of this product, the Quartz
TM
smart valve and
diverter MUST be installed in one of the orientations shown.
PLEASE NOTE: If installing a diverter please also note all areas marked with this symbol.
INSTALLATION
For installation with the diverter.
2
Isolation valves are supplied with the Quartz
TM
smart valve and
diverter valve and must be fitted on both inlets and the blended
water outlet/ outlets. For optimum performance on gravity fed
systems 22mm pipe work should be run as close to the Quartz
TM
smart valve as possible before reducing down to 15mm. All pipe
work should be supported.
The inlet supply centres are 48mm.
Please note arrow on isolation valve to indicate direction of flow.
DO NOT use compression fittings on the inlet and outlet spigots this will aect the
warranty if fitted.
3
Choose the position for your Quartz
TM
smart valve as close to the shower control as possible.
The Quartz
TM
smart valve may be sited in the roof space above the proposed shower site, in the
airing cupboard or behind a screwed bath panel if more convenient. If siting in the roof space,
ensure that freezing cannot occur and that no insulation material is placed under or over the
Q
TM
smart valve or diverter. Please refer to the system layout.
If installing a diverter, choose the position for the Quartz
TM
smart valve as close to the
diverter as possible, within the range of the 2m connecting data cable provided.
4
Place the Quartz
TM
smart valve on a solid mounting surface, and
place the fixing feet into suitable positions. Mark then drill and
prepare suitable fixings before securing the Quartz
TM
smart valve
to the mounting surface using the screws provided, (if suitable).
If installing the diverter this also needs to be installed as per the
above instructions in step 4
5
Flush through both hot and cold supply pipes.
The maximum hot water inlet temperature must be no more than 65˚C.
6
Attach the supply pipes to the Quartz
TM
smart valve, ensuring that
the cold and hot feeds are fitted into the appropriately marked
inlets.
Do not solder near to plastic components.
7
Prepare and connect a pipe from the mixed water outlet on the
Quartz
TM
smart valve through the wall to the proposed siting for
the shower outlet.
Using pipe clips as appropriate, ensure that all pipe work is
perpendicular to the Quartz
TM
smart valve, i.e. not putting any
strain on the fittings.
If installing a diverter prepare and connect the pipe from the mixed water outlet on the Q
TM
smart valve through to the diverter inlet. The diverter can be fitted directly onto to the
Q
TM
smart valve outlet if required on the HP/Combi system installation. A cranked M/F elbow
is supplied for the Gravity Pumped system for ease of installation. Refer to images in point 1.
Ensure the isolation valves are connected to the diverter outlets with the arrows correctly
aligned according to the direction of flow. Using pipe clips as appropriate, ensure that all pipe
work is perpendicular to the Quartz
TM
smart valve and diverter, i.e. not putting any str
ain on the fittings.
Prepare and connect the pipes from the diverter outlets to the proposed siting for the outlets.
To maximise flow rates we recommend using copper pipe with the minimum amount of
elbows on all pipes leading to and from the Quartz
TM
smart valve.
Ensure the pipe work connections have been flushed through.
If fitting a bath outlet, a suitable non restrictive double check valve (not supplied) MUST be
fitted to the blended outlet pipe in line with the current water regulations.
BEFORE ANY ELECTRICAL ADJUSTMENT IS ATTEMPTED, THE ELECTRICITY SUPPLY MUST BE
TURNED OFF AT THE MAINS SWITCH.
ELECTRICAL INSTALLATION MAY ONLY BE CARRIED OUT BY A QUALIFIED PERSON.
!
8
Unscrew the single fixing on top of the Quartz
TM
smart valve and
carefully tilt the lid up and o the location lugs and pull the lid clear.
If installing the diverter also remove the lid following the
instructions above in step 8.
9
As installation diers for dierent controls please refer to the relevant smart controller
installation guide for the Quartz
TM
smart valve and diverter wiring.
10
Connect the Quartz
TM
smart valve power lead to a double pole 3
amp fuse switched spur incorporated in the fixed wiring circuit, in
accordance with current wiring rules. Ensure that this is located
in an accessible, dry location and not in the bathroom.
THIS APPLIANCE MUST BE EARTHED
We recommend protecting surface mounted cables in suitable approved conduit to avoid the risk of
damage from vermin.
The power lead should also be clipped in place with ‘P’ clips or similar to avoid accidents.
!
11
The Q
TM
smart valves are supplied factory set with the flow rate at
either ‘NORMAL HP’ or ‘NORMAL GRAVITY’ mode depending on
which system has been ordered.
BALANCED HP SYSTEMS:
Standard Q
TM
smart valves fitted to balanced high pressure sys-
tems may be set to ‘NORMAL HP’ or for water economy ‘ECO’
modes.
STANDARD COMBINATION BOILER SYSTEMS:
For Standard Quartz
TM
smart valves installed on combi boiler
systems, for optimum performance we recommend setting to the
‘COMBI’ mode.
The ‘ECO’ flow rate mode should NOT be selected for shower or bath systems fitted
to combination boilers.
PUMPED QUARTZ
TM
SMART VALVE:
Pumped Quartz
TM
smart valves are fitted to gravity systems may be set to ‘NORMAL
GRAVITY’ or for water economy ‘ECO’ modes.
When making any adjustment to the Quartz
TM
smart valve settings the power must
be isolated.
12
Run the shower at maximum temperature (factory pre set to
45ºC). If required, maximum temperature adjustment can be
made with a flat bladed screwdriver using the MAX TEMP
ADJUSTMENT’ control as indicated. When the temperature
has been set to the desired position, carefully replace the
Quartz
TM
smart valve lid and secure the fixing screw, hand
tight only.
Site conditions can aect temperature settings, installer to adjust as required.
All copper pipe work must be cross-bonded and connected to a reliable earthing point.
13
Please refer to the separate Q
TM
controller installation guide to complete installation.
Quartz
TM
smart valve connected
directly to diverter valve
Quartz
TM
smart valve connected to
diverter with additional pipe
Quartz
TM
smart valve connected
directly to diverter valve
Quartz
TM
smart valve connected
to diverter with additional pipe
HP/Combi Quartz
TM
smart valve
Gravity pumped Quartz
TM
smart valve
This product must be installed by a competent person in accordance with the relevant
current Water Supply Regulations.
In addition to the guide below it is essential that the written instructions overleaf are read
and understood and that you have all the necessary components (shown bottom right)
before commencing installation.
The Quartz
TM
smart valves are supplied with universal fixings intended to secure it to a
solid mounting surface.
!
!
The Quartz
TM
smart valve and diverter must be sited in a position that is safely accesible
for servicing and commissioning purposes. When fitted in the loft space, the route to and
the area around the Quartz
TM
smart valve must be boarded to ensure a safe working
environment.
The optimum position for the Quartz
TM
smart valve and diverter is in the roof space above
the Q
TM
controller site to take full advantage of the ease and speed of installation.
The distance between the Quartz
TM
smart valve and main Q
TM
controller must be within the
range of the 10m data cable supplied.
The diverter inlet has been designed to enable connection directly inline with the HP/
Combi Quartz
TM
smart valve outlet isolation valve connection or o the Gravity Pumped
Quartz
TM
smart valve outlet using the cranked M/F elbow connection fitting.
)
. .
!
!
!
!
!
!
Single outlet
Components (Gravity pumped) Components (HP/Combi)
Components (Gravity pumped) Components (HP/Combi)
Single outlet
With diverter
With diverter
265mm
70mm
350mm
270mm
445mm
445mm
270mm
Max 2m
Max 2m
197mm
240mm
70mm